FOOD MANUFACTURER INSTALLATION
Food & Production Plant
The Brief
One of the UK’s largest food manufacturers based in Stoke on Trent approached Bry-Kol to assist them in updating their existing staff canteen kitchen area.


High-end Brand
The client is a high-end brand, located on Sloane Street in London. As with most retail store development projects undertaken by BryKol, this was a fast track project, to be completed in order to get the store open and profitable as soon as possible.
Installation
This remodelling involved the complete installation of a 3 storey retail unit, finished to a high standard and included full mechanical comfort cooling, natural ventilation and plumbing services to all floors.
Working closely with a committed team of designers, contractors and the client is necessary and key to maintaining Brykol’s reputation in this field which was achieved in full.
The Client
The Client is one of the UK’s largest food manufacturers based in Stoke on Trent.


Installation
We worked closely with the client to offer a variety of solutions that best suited their requirements and budget.
Works carried out, included;
a new ventilation system,
cooker hoods,
gas proving systems,
pipework to all new appliances,
and electrical control system.
Working closely with a committed team of designers, contractors and the client is necessary and key to maintaining Brykol’s reputation in this field which was achieved in full.

Project management of a team of designers, and contractors
The work was carried out during a short time frame as the area provides all the staffs break/food requirements.
A schedule of works was planned in advance to ensure that various trades involved in the installation could work effectively with minmal disruption.
Project management of a team of designers, and contractors
Fast-tracked project to be completed within 12 weeks
Installation of mechanical ventilation
Installation of Heating
Installation of plumbing to each floor
Management consultancy
Installation of a new ventilation system & cooker hoods
gas proving systems & pipework to all new appliances
Installation of electrical control system.
The overall project took just twelve weeks to an approximate fit-out value of £250K. The project was completed on time and within budget, to the client’s satisfaction.
The project was completed in a timely manner and the client was extremely happy with the works carried out, with minimal disruption to their operations and production.